Year: 2024
Type: conference-paper
Abstract: For the ongoing upgrade of the Swiss Light Source (SLS) storage ring, the previous ageing beam-based feedbacks and beam position monitor (BPM) systems are replaced by newly developed versions, where beam commissioning is planned to start in January 2025. Feedbacks include the fast orbit feedback (FOFB), transverse and longitudinal multibunch feedback (MBFB), and filling pattern feedback (FPFB). In this contribution, we give an overview of the architectures and development/production status of these feedbacks and of the BPM system, including latest pre-beam test results.
Authors: Keil,Boris, Marcellini,Fabio, Marinkovic,Goran, Purtschert,Jonas, Roggli,Markus, Baeta Neves Diniz Santos,Pedro, Ditter,Robin
Language: English
Subfield: Aerospace Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W6962932286
FWCI:
Cites:
Cited by:
Related to:
