ESS DTL: final installation and first commissioning results up to 74 MeV
Year: 2024
Type: conference-paper
Abstract: The Drift Tube Linac (DTL) for the European Spallation Source (ESS ERIC) will accelerate proton beam up to 62.5mA peak current from 3.62 to 90 MeV. The 5 cavities are now fully installed and tested in the linac tunnel. Moreover, in 2023 DTL1 to DTL4 have been RF conditioned to full power and beam commissioned with max peak current at short pulses. Relevant results of these activities are presented in this paper.
Source: JACOW
Authors: Grespan,Francesco, Pisent,Andrea, Palmieri,Antonio, Jones,Bryan, Baltador,Carlo, Mingioni,Carlo, Plostinar,Ciprian, Nicoletti,Edoardo, Page,Laurence, Bellan,Luca, Nenni,Marco, Montis,Maurizio, Comunian,Michele, Milas,Natalia, Mereu,Paolo, Zeng,Rihua, Miyamoto,Ryoichi, Bencivenga,Tina, Levinsen,Yngve
Language: English
Subfield: Aerospace Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: hybrid
OpenAlex ID: W6963354363
FWCI:
Cites:
Cited by:
Related to:
