Year: 1995
Type: report
Abstract: Within the decommissioning scenarios for the B-Zone waste rock pile, a passive \ntreatment approach for seepages which might emerge from the recontoured and \nrevegetated pile is being considered. The muskeg areas to be used are within the \nwaste management area, located between the waste rock pile and the pit or lvison Bay. \nDesign criteria for a scale-up of the process to relegate As and Ni to sediments in these \nareas are based on 3 years of laboratory and field work. In collaboration with CANMET \nbiotechnology, the forms of As and Ni which would be retained in the wetland \nsediments were determined and found to be environmentally stable under prevailing \ncondition. Both elements are primarily complexed as organic particulates which are \nformed in association with the decomposition of added organic materials. In this form, \nthe As and Ni settle to the sediment where they are transformed into insoluble metal \nprecipitates as favourable Eh and pH conditions are encountered in the deeper portions \nof the sediment. Estimates of removal rates based on the experiments are 0.046 to 0.25 g.m-*.day-’ for \nAs and 0.05 to 0.36 gm*.day” for Ni. Loading from the waste rock pile seepages are \nestimated as 153-398 kg.yr-’ for As and Xl-1,397 kg.yr-’ for Ni for 1992 to 1994 based \non 7 % of precipitation reporting as run-off. \nAn open water muskeg in the vicinity has an area of 2.4 ha and therefore theoretically \nsufficient to accommodate the annual loadings from the pile. Design criteria for scaleup \nare presented.
Author: Boojum Research Limited
Language: English
Subfield: Environmental Chemistry
Field: Environmental Science
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W6980929841
