Optimising Total Productive Maintenance (TPM) and \nasset management strategies through Artificial Intelligence (AI) technologies: the development and enhancement of Abu Dhabi power networks
Year: 2021
Type: dissertation
Abstract: Maintenance has a significant impact on the business strategy of power organisations. Maintenance of power \nplants aims to promote safe, cost effective, and reliable electricity supplies. This kind of maintenance has \ncomplex activities and requires highly skilled maintenance staff; therefore, proper utilisation of technology is \ncritical to achieve both plant safety and availability. The implementation of modern maintenance strategies has a \npositive impact on improving reliability and performance of power assets. Total Productive Maintenance (TPM) \nis an ideal approach to support the development and implementation of operation performance improvement. \nImplementation of TPM programmes needs effective leadership and strategic planning skills. However, there has \nbeen almost no research applied in this area within Middle-East power plants. The power industry in the United \nArab Emirates is in the early stages adapting proactive maintenance programmes, and the aim of this research is \nto thus investigate the critical factors that affect successful implementation of TPM programme in the Abu Dhabi \npower industry environment. The study is focused in the unique context of Abu Dhabi power organisations, and \nseeks to formulate critical success factors and enablers for overcoming barriers and obstacles to successful TPM \nimplementation. To achieve the aim of this research, the researcher utilises a design of exploratory sequential \nmixed methods, starting with a qualitative approach. Semi-structured interviews were conducted with 16 \nemployees, (including senior management, middle managers and senior engineers) to identify the technical and \ncultural barriers that could affect TPM implementation across power plants. The quantitative approach included a \nquestionnaire which was distributed to 250 employees, comprising engineers, maintenance planners, technicians, \nand operators using a hand-delivered questionnaire. Structural equation modelling, using partial least squares path \nanalysis (SmartPLS software version 3.0), was performed to test the hypothesised model. A sample of both \napproaches comprising three participant organisations was selected based on their experience in operations and \nmaintenance of power plants, particularly in the power sector and included power generation, transmission as \nwell as distribution organisations. In short, the empirical results confirmed the role of organisational culture and \nstructural employee empowerment in participation of autonomous maintenance. Furthermore, this research is the \nfirst empirical study to examine the potential impact of organisational culture and structural empowerment on \nautonomous maintenance (operators) participation in maintenance activities in the context of the Abu Dhabi \npower industry. \nA novel approach combining TPM with prognostic and RCM models has been developed. The researcher utilised \na simulation approach (ReliaSoft’s Weibull simulation + Availability Workbench (AWB) Monte Carlo \nsimulation) to appraise the impact of effective prognostic techniques and examine the role of reliability centred \nmaintenance (RCM) on successful participation of autonomous maintenance (operators) in power plants using \nmaintenance optimisation models based on artificial intelligence (AI) technologies. Historical data (degradation \nmeasurements + maintenance costs) from power transformers for critical power distribution substations were \ncollated to conduct the simulation approach. The analysis is based on degradation analysis, and failure mode \neffective and criticality analysis (FMECA). Based on the analysis, remaining useful life (RUL) of critical power \nassets (transformer paper insulation) was determined and preventive maintenance (PM) intervals and costs of \ntransformer tap changers (OLTCs) were optimised. Simulation results are presented to verify the analytical \napproach and validate proposed operational procedures. The proposed maintenance optimisation models \nperformed good simulation results, and the latter show that the proposed models are really a new contribution in \nthe area of TPM implementation in the power industry. Moreover, the integration of AI technologies with TPM \nimplementation has enhanced the practice and theory of autonomous maintenance empowerment across power \nplants. The novelty of model is to build a proposed approach and solution based on operational steps and \nutilisation of a simulation model to empower and enable operator’s participation in maintenance activities in the \npower industry. With respect to the simulation results of power transformers, the findings can contribute towards \nimproved equipment operations and successful implementation of TPM in power organisations. Furthermore, \nbased on the study findings cumulatively, an innovative operational framework with detailed plans for TPM \nimplementation was developed and formulated. This research has made several original contributions to \nknowledge in the parlance of maintenance management, with particular reference to TPM implementation across \nAbu Dhabi-based power industry organisations. The main contribution is the demonstration and establishment of \na sound practical approach and model to integrate methods and principles of AI technologies within prognostic, \nRCM and TPM to support operators in decision making through identifying new policies for machine \nmaintenance or assessment and enhancement of existing maintenance plans and costs. The model also delivers \nguidelines to operators for executing a practical, operational framework for TPM implementation.
Institution: University of Greater Manchester
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Keywords: total productive maintenance, asset management, power plants, success factors, autonomous maintenance, organizational culture, reliability-centered maintenance, artificial intelligence, electric utilities, maintenance planning, maintenance cost reduction, maintenance availability, maintenance planning and scheduling
Open Access status: green
OpenAlex ID: W6995502943