Year: 2023
Type: book
Abstract: The FIRST project commenced in January 2017 and concluded in December 2022, including a 24-month suspension period due to the COVID-19 pandemic. Throughout the project, we successfully delivered seven technical reports, conducted three workshops on Key Enabling Technologies for Digital Factories in conjunction with CAiSE (in 2019, 2020, and 2022), produced a number of PhD theses, and published over 56 papers (and numbers of summitted journal papers). The purpose of this deliverable is to provide an updated account of the findings from our previous deliverables and publications. It involves compiling the original deliverables with necessary revisions to accurately reflect the final scientific outcomes of the project.
Authors: Xu, Lai, de Vrieze, Paul
Institutions: Sapienza University of Rome, Shanghai Polytechnic University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W7009030003
