Third order resonance correction using new Trim-S system in J-PARC MR
Year: 2025
Type: conference-paper
Abstract: In the Japan Proton Accelerator Research Complex (J-PARC) Main Ring (MR), to address the issue of resonance correction for third-order resonances in both on- and off-momentum particles, an upgrade project utilizing 24 Trim-S units has been proposed based on numerical simulations. As a first step in verifying its effectiveness, four additional Trim-S (new Trim-S) power supplies, configured with a System-on-Chip (SoC) Field Programmable Gate Array (FPGA) controller, have been installed. The performance of the new system was experimentally verified by correcting the resonance using these 4 new Trim-S units. Beam loss was successfully reduced compared to that with the original Trim-S system, demonstrating the effectiveness of the new system.
Source: JACOW
Authors: Tan,Yulian, Morita,Yuichi, Yoshii,Masahito, Yasui,Takaaki, Hotchi,Hideaki, Igarashi,Susumu, Asami,Takashi, Miura,Kazuki, Ono,Ayato, Sagawa,Ryu, Yoshinari,Masaki
Language: English
Subfield: Aerospace Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: hybrid
OpenAlex ID: W7104293000
FWCI:
Cites:
Cited by:
Related to:
