Magnet contructed and tested
Year: 2025
Type: article
Abstract: This report presents Milestone MS56 of I.FAST Work Package 11, dedicated sustainable concepts and innovative technologies. Within Task 11.3, the realization of PM-based combined function magnet with dipole and quadrupole fields, aimed towards the magnets used in the Diamond-II lattice have been successfully designed and manufactured. Dimensional checks and the related activities confirm overall compliance with project specifications. Although a few deviations from nominal tolerances were identified, they are minor, non-critical, and manageable in the final magnet assembly. The completion of this milestone provides validated components for the next phase of the WP11.3, enabling the measurement of this new Permanent Magnet Quadrupoles & Combined Function Magnets for Ultra Low-Emittance Rings at Daresbury Laboratory (Deliverable 11.3).
Author: I.FAST WP11 members
Language: English
Subfield: Aerospace Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W7104951775
FWCI:
Cites:
Cited by:
Related to:
