METHOD OF PRELIMINARY CALCULATIONS FOR CREATION OF TEMPORARY RING MODES IN ELECTRICAL NETWORKS 6-10 kV

Year: 2025
Type: article
Abstract: The work explores a preliminary calculation method to determine the possibility of switching on transformers for parallel operation and creating temporary ring modes in electrical networks of 6 - 10 kV, in order to ensure the transfer of electrical power to consumers without interruptions in power supply. Subject: of research: ring mode of operation of power transmission lines (PTLs) in electrically unconnected distribution networks of 6-10 kV. Materials and methods: the work first proposed a method for creating ring modes of power lines in 6-10 kV electrical networks receiving electrical power from different power centers, between which there is no possibility of creating a temporary electrical connection, by turning on a sectional switch or a separate shunt connection (repair jumper) , for subsequent creation of a ring mode. Results: using the method of preliminary calculations, results were obtained that allow a preliminary assessment of the possibility of creating a ring mode of 6-10 kV power lines between electrically unconnected power centers (CPs). Conclusions: the method proposed in the work for preliminary calculations of steady-state modes makes it possible to assess the possibility of creating a short-term ring mode in electrically unconnected 6-10 kV distribution networks.
Authors: A. Arifov, Eskender Bekirov
Language: English
Open Access status: diamond
OpenAlex ID: W7105905537
FWCI:
Cites: 3
Cited by:
Related to: