Timber circularity on modern Ganlan vernacular architecture in Chongqing, China
Year: 2026
Type: article
Abstract: Urban renewal in southwestern China is transforming traditional timber dwellings while heritage conservation remains a parallel demand. Demolition of vernacular buildings produces solid wood components, prompting questions of circular use. This study investigates timber circularity in Chongqing through fieldworks, on-site measurements, interviews, and comparative analyses of reclaimed timber markets and reutilized components in modern vernacular architecture. The reclaim stage comprises demolition, transportation, preliminary processing, storage, and shop-based sale, while the reutilization stage involves secondary processing and construction. Findings show that reutilized timber dominates in medium beams, trusses, and large columns, whereas slabs, small columns, doors, and panels are more often provided in reclaim. The reutilized timber is typically longer with smaller cross-sections, reflecting shifts of function and construction in modern vernacular architecture. The circularity system remains at an early stage, largely driven by informal practices, constrained by weak awareness, absent standards, limited platforms, and outdated processing. Nonetheless, it would hold significant potential to evolve into a structured and sustainable framework with policy and technical support. • Material circularity is a key issue in the modernization of vernacular architecture. • Chongqing’s timber circularity system has taken shape despite its early stage. • Reutilized timber mainly applies to large and medium supporting components. • Reutilized timber shows longer lengths but smaller cross-sections. • Supply–demand alignment reveals transitions of modern vernacular architecture.
Authors: Yang Fanglin, Mao Jingyan, Murata Ryo
Institutions: South Central Minzu University, Institute of Science Tokyo
Language: English
Subfield: Archeology
Field: Arts and Humanities
Domain: Social Sciences
Open Access status: gold
Estimated APC paid: $2,660
Award: G3940080764
OpenAlex ID: W7124426251
