Manufacturability Assessment of Design Decisions for Reducing Material Diversity in Single-Piece and Small-Batch Production
Year: 2026
Type: article
Abstract: The article presents a method that supports the evaluation of design manufacturability in the area of input material selection, enabling the reduction in material diversity under single-piece and small-batch production conditions. The proposed approach combines the analysis of alternative materials with activity-based costing (ABC) and data concerning actual and planned material requirements. The method enables the assessment of the impact of semi-finished product substitution on material costs, processing costs, production organisation, and material-management costs before order execution is launched. In the conducted case study, it was demonstrated that effective management of material diversity can significantly reduce the range of materials and decrease total manufacturing costs. For the analysed period, the number of material items was reduced from 32 to 19 (a 41% reduction), resulting in cost savings of approximately 11,000 PLN. In addition to total cost, the approach supports the assessment of operational benefits associated with reduced material diversity, such as a lower number of material items, fewer suppliers, reduced inbound inspection and receipt operations, and decreased inventory levels and capital tied up in stock. Material substitution may decrease or increase direct material costs and may increase machining time when larger dimensions are used; therefore, the method jointly evaluates cost and lead-time impacts prior to order release. The results confirm that integrating design, technological, and logistics data is an effective approach to rationalising material management in machinery manufacturing enterprises.
Source: Materials
DOI: 10.3390/ma19020399
Institutions: University of Bielsko-Biała, University of Žilina
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $3,137
OpenAlex ID: W7124826900
