Cost and Schedule Optimization in Building Projects Using an Integrated Management System in an Emerging Urban Context = Optimización de Costes y Plazos en Proyectos de Edificación mediante un Sistema Integral de Gestión en un Contexto Urbano Emergente: Evidencia Empírica en la zona metropolitana de Lima, Perú
Year: 2026
Type: article
Abstract: This study presents the implementation and validation of an Integrated Management System (IMS) aimed at optimizing costs and deadlines in multifamily building projects in Metropolitan Lima, Peru. The research was developed under a quantitative approach and a pre-experimental design, applying GIS in five projects selected according to criteria of technical comparability, accessibility to financial information and location in an emerging urban context. Projects without GIS presented an average cost overrun of 8.82%, while those managed with GIS remained at 0.54%, even considering the cost of management. In terms of time, average delays decreased from 15.54% to 7.14%. In addition, a high level of compliance with the system was observed (over 90%), reflecting its operational viability and acceptance by the technical teams. GIS proved to be an effective tool to improve traceability, inter-area coordination and decision-making on site, without requiring high technological investments. These findings confirm the hypothesis that integrated and structured management can mitigate critical deviations in building projects, especially in emerging urban contexts.
Source: Hispana
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W7128939690
FWCI:
Cites:
Cited by:
Related to: