Work

OSeMOSYS vs MUSE Models in long-term energy planning. A case study of DRC power sector

Year: 2026
Type: article
Abstract: This upload contains the OSeMOSYS and MUSE model files developed for analyzing long-term power-sector pathways in the Democratic Republic of the Congo. The models are used to explore how different planning assumptions and investor behaviors influence electrification, technology deployment, and low-carbon transition outcomes.
Authors: KOSHIKWINJA MATABISHI, Pacifique, CAVANA, Marco, LEONE, Pierluigi
Language: English
Open Access status: green
OpenAlex ID: W7140208432
FWCI:
Cites:
Cited by:
Related to: