APR-Lite Phases 10.0–10.3 — Sector Escalation, Retention Windows, Peer Grants, and Cross-Tenant Read Enforcement
Year: 2026
Type: article
Abstract: This note records the completion of four phases that transformed the APR-Lite substrate from a set of governance surfaces into a coherent constitutional machine. Phase 10.0 activated sector-level freeze escalation. Phase 10.1 introduced temporal retention windows. Phase 10.2 completed the bilateral peer grant lifecycle. Phase 10.3 wired every governance primitive into the cross-tenant read path. As of Phase 10.3, every cross-tenant read is a fully governed operation.
Author: Truong, Narnaiezzsshaa
Language: English
Topic: Access Control and Trust
Subfield: Sociology and Political Science
Field: Social Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W7142051420
FWCI:
Cites:
Cited by:
Related to:
