<技術報告>布目ダム上流におけるハイドロフォンによる流砂観測 : 流砂量に及ぼす洪水履歴の影響
Year: 2014
Type: article
Abstract: Bedload has been monitored using a pipe hydrophone in an upstream-reach of Nunome-Dam for 3 years, including various levels of flood event each year. The hysteresis curve between discharge and bedload in each event changed according to the previous occurrence of large flood. Bedload at given discharge was equal between rising and receding phases in events preceding to a large flood, while that of rising phase increased in a few events after the large flood. Bedload is likely to increase temporally after a sediment supply from banks and tributaries occurring during large floods.
Language: Japanese
Subfield: Earth-Surface Processes
Field: Earth and Planetary Sciences
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W7144493746