Year: 2017
Type: dissertation
Abstract: The healthcare facilities in Finland as in many other countries need significant investments during the next decade. The old-fashioned buildings are in many cases not able to answer the demands posed by the evolving medical technology, changes in demographics, care trends, and capacity needs, or political decision-making. However, there is clearly room for improvement with how efficiently the hospital projects are carried out to make the most out of these investments. Hospitals are perceived to have a relatively high number of changes compared to many other types of construction, even in the late project phases, and changes often have negative effects to the project efficiency. Changes are overall known as a significant factor causing cost and schedule overruns in construction projects, while they cause disturbances to the planned workflow and are a primary reason for rework. This thesis focuses on three question related to project changes: 1) why changes are needed in hospital construction projects, 2) what effects do changes have on the different stakeholders, and 3) how changes could be managed better during the project. A multiple case study of five recent hospital construction projects from Finland, Sweden and the U.S. was conducted with semi-structured interviews. The findings show that the procurement of medical equipment and extensive user involvement in the design are two important change sources in the hospital construction context, which have not earlier been included in more general change categorizations. Furthermore, the identified change root causes can often be linked to project complexity, mainly in the structural complexity, uncertainty, and socio-political complexity dimensions. This leads to the conclusion that changes are to some extent needed to answer the changing demands inside and outside the project, being necessary to project success. The concept of project flexibility is suggested as an approach to mitigate the negative effects of changes, by allowing for changes later during the project. The thesis has several theoretical implications: new change source categories were created to suit the hospital construction context, construction changes had not previously been linked with project complexity factors, and the use of project flexibility strategies as a change mitigation measures is a new approach compared to the dominant change avoidance. Important managerial results include the practical methods of executing flexibility in projects and the possibility of better collaboration between the owners and contractors through trust and relational project delivery methods.
Source: Aaltodoc (Aalto University)
Author: Särkilahti, Anna
Institution: Aalto University
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W7146072269