Critical Process Relocation in Fragmented Multi-Building Food Production: Integrating Layout Redesign, Material Flow, and Economic Feasibility
Year: 2025
Type: article
Abstract: Facility layouts in small-scale food industries often develop incrementally without comprehensive flow planning, resulting in lengthy, discontinuous, and costly material movements. This gap arises because many studies still focus on single-building relayouts and fail to incorporate cross-building flow, critical process separation, and implementation feasibility into a single evaluation. This study aims to evaluate the fragmented layout of a krecek rambak (traditional Indonesian beef skin crackers) processing business in Mojokerto Regency, East Java Province, Indonesia, and to design a proposed layout that better aligns with the actual production flow. The study was conducted at a facility occupying three separate buildings with a manual handling system. The analysis included field observations, process mapping, a From-To Chart, rectilinear distance measurements, proximity analysis, layout alternative generation, material handling cost evaluation, and feasibility analysis. The results show a decrease in total movement distance from 5,837 m to 2,504 m, a decrease in movement frequency from 15 to 12, a decrease in daily material handling costs from IDR 403,294 to IDR 111,949, and a reduction in the critical path from 134.5 m to 12 m. These findings indicate that relocating critical processes is more effective than expanding general facilities in reducing costs and improving flow continuity. The practical implication lies in the availability of a more scalable, efficient, and feasible relayout decision-making basis for small-scale, incrementally expanding multi-building production systems.
Institution: Universitas Internasional Semen Indonesia
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $33
OpenAlex ID: W7164353108
