Work

Design of emergency expansion project for sewage treatment plant with multi process coupling control

Year: 2025
Type: article
Abstract: The emergency rescue and expansion project of sewage treatment plants has always been a difficult point in the water treatment industry, especially the coupling regulation of multiple processes brings greater risks and uncertainties to emergency rescue. To control the overflow pollution of the external pipeline network, a sewage treatment plant in Hunan needs to urgently expand its treatment capacity from 6.0×104 m3/d to 1.2×105 m3/d within 90 days,and production cannot be stopped or reduced during the construction period, which does not bring secondary risks. This project aims to address the difficulties of multi process coupling regulation. The advanced high concentration composite powder carrier bio-fluidized bed technology(HPB technology) was used to explore the potential of the existing main process AAO in the original tank, and a new integrated secondary sedimentation tank and filter cloth filter tank were constructed. Through the linkage regulation of multiple processes before and after, the emergency expansion and safe operation of the sewage treatment plant had been successfully doubled. After completion, the treated water volume would reach a stable level of 1.20×105 m3/d or above, and the effluent would meet the Class A standard of the Pollutant Discharge Standard for Urban Sewage Treatment Plants(GB 18918-2002). The design, procurement, construction, and commissioning of this project took a total of 80 days, and the entire construction process was achieved without stopping or reducing production, without bringing any secondary risks and causing negative impact on production.
Language: Chinese
Subfield: Pollution
Open Access status: diamond
OpenAlex ID: W7155546852
FWCI:
Cites:
Cited by:
Related to: 9