Maximizing the Total Weight of Just‐In‐Time Jobs in A Two‐Stage Flexible Flow Shop With Dedicated Machines
Year: 2026
Type: article
Source: Naval Research Logistics (NRL)
DOI: 10.1002/nav.70084
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
Awards: G3647827565, G8477095532
OpenAlex ID: W7166519500
