Year: 2026
Type: preprint
Abstract: The rapid growth of AI data centers is straining power grids. Yet whether siting costs are driven by short-run electricity prices or network topology remains unclear. Here, we address this by comparing two distinct 2030 power systems, New Zealand's radial grid and Ireland's meshed ring. Testing identical loads across hundreds of scenarios varied by gas and carbon prices, demand, weather and transmission capacity, we find network topology dominates siting costs. New Zealand splits into two cost zones across the Cook Strait link, where the 4.18% gap matches the one-way converter loss exactly and vanishes when that loss is removed. In contrast, Ireland stays a single cost group under routine operation with variations below 0.1%. Our results demonstrate that price signals effectively guide data center siting primarily where the network is bottlenecked. In highly meshed grids, physical grid reinforcement becomes essential.
Source: Research Square
Institution: University of Auckland
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W7167893792
