Work

Optimization of Truck Transportation Flow Time in Open-Cast Lignite Mines Using DMAIC Methodology

Year: 2026
Type: conference-paper
Abstract: Material transportation systems used in open-cast lignite mines often suffer from extended flow times due to high non-value-added times, excessive waiting times, resource bottlenecks, and improper system design. This leads to less throughput per day, higher fuel usage and less number of truck trips ultimately lowering productivity of the mine. The aim of this paper is to study and improve the truck transportation process through DMAIC (Define-Measure-Analyse-Improve-Control) approach of Lean Six Sigma methodology combined with Value Stream Mapping and simulation modelling. Extensive data related to the movement of trucks like entry or exit times at gates, travel times, loading/unloading times, queue lengths, number of trucks waiting and weighbridge usage were recorded from the mine during various shifts. Present state value stream map was created to identify value-added as well as non-value-added activities and also to determine the baseline performance of the system. Models for current system were created using Arena software to determine important performance metrics such as average cycle time, waiting time, queue size and overall system efficiency. Simulation of current scenario (System A) showed high congestion due to multiple bottlenecks present throughout the system causing weighbridges to be used to their maximum utilization and trucks being in non-value-added waiting activity for a major portion of the cycle time. An improved version (System B) was created with improvised lean changes to the process and modelled using simulation. Another scenario (System C) was proposed with an increased service capacity and all the three systems are compared. Simulation results shows that System A worked at 8.26% of its system efficiency. After implementing some lean concepts in the system, System B got much better and worked at 22.39% of its efficiency. Further enhancement through increased service capacity, System C resulted in approximately 44% of its system efficiency. Keywords: Lean Six Sigma; DMAIC; Value Stream Mapping; Discrete-Event Simulation; Truck Transportation; Mining
Language: English
Open Access status: green
OpenAlex ID: W7203446867
FWCI:
Cites:
Cited by:
Related to: 10