Work

Modeling the Potential of a Roadside Two-Stage Ditch to Reduce Flooding and Erosion Risks

Year: 2026
Type: article
Abstract: Recent efforts to address flooding have explored incorporating flow-reduction capabilities into existing infrastructure. Roadside ditches have historically been viewed as an underutilized component of flood reduction, and a two-stage design has been proposed that modifies a conventional trapezoidal ditch by incorporating bench insets along the main channel. While it is expected that this second stage becomes inundated during storm events, resulting in flow attenuation, the exact impacts of this design are unknown. This study quantified the impact of the two-stage design by modeling a roadside ditch corridor in eastern Iowa. An existing single-stage ditch was converted to a two-stage design, and a HEC-RAS model was constructed to investigate the ditch’s impacts for four design storms (1-year, 2-year, 5-year, and 10-year). In the modeled results, peak flow rates were reduced by 22%, 21%, 7.5%, and 4.3%, respectively, while water volume reductions were near 6%. Maximum velocities throughout the ditch corridor also decreased, with reductions spanning 32% (1-year)–45% (10-year). These results indicate that increased travel times and infiltration associated with the two-stage design provide hydrologic and hydraulic benefits by lessening flood and erosion risk. While further study is needed to verify this behavior through monitoring and modeling at other locations, our findings suggest that two-stage ditches can be a useful best management practice for the transportation community.
Source: Hydrology
Language: English
Open Access status: gold
Estimated APC paid: $2,172
Award: G143829164
OpenAlex ID: W7203653475
FWCI:
Cites: 45
Cited by:
Related to: