Real-time prediction of the natural decline rate of groundwater inflow from a fault zone or fractures during tunnel excavation and application to deciding on whether to implement grouting
Year: 2026
Type: article
Abstract: Real-time prediction of the natural decline rate of groundwater inflow during tunnel excavation in faulted or fractured rock is crucial for deciding on whether to implement grouting. In this study, two pilot boreholes were drilled at the Horonobe Underground Research Laboratory, Japan, prior to the excavation of tunnels at depths of 350 and 500 m in faulted siliceous mudstone, and inflow from a fault zone (or fractures) in each borehole was analyzed using log–log plots of inflow rate versus elapsed time based on the hydraulic diffusion equation. The plots for both boreholes are characterized by a power law relationship. The plot for the tunnel at 500 m depth shows a steep slope indicating a rapid reduction in inflow. Accordingly, this tunnel was successfully excavated without pre-grouting. The results show that a log–log plot of inflow rate versus elapsed time, as obtained from a fault zone or fractures in a pilot borehole, can be used to rapidly predict the natural decline rate of inflow and determine whether grouting is needed for tunnel excavation.
Authors: Hiroaki Murakami, Eiichi Ishii, Keisuke Yagi
Institutions: Japan Atomic Energy Agency, Taisei (Japan)
Language: English
Subfield: Environmental Engineering
Field: Environmental Science
Domain: Physical Sciences
Open Access status: hybrid
Estimated APC paid: $3,990
OpenAlex ID: W7203899913