Techno-Economic Analysis and Profitability Thresholds of Large-Scale Hybrid PV-Battery Storage Systems in Poland
Year: 2026
Type: article
Abstract: This study presents a techno-economic assessment of utility-scale photovoltaic (PV) installations integrated with Battery Energy Storage Systems (BESSs) in the context of Poland’s energy transition. Three technical configurations are analyzed: a standalone 100 MW PV plant, a standalone 100 MW/500 MWh BESS facility, and a hybrid PV-BESS system. Economic performance is evaluated using Net Present Value (NPV), Internal Rate of Return (IRR), and Levelized Cost of Electricity/Storage (LCOE/LCOS) metrics. Under base-case market conditions, the standalone PV plant remains highly profitable (NPV = €57.2 million, IRR = 15.7%), while standalone storage is economically unviable (NPV = −€102.8 million). The hybrid PV-BESS system also yields a negative NPV (−€46.5 million) in the base case; however, optimization identifies key profitability thresholds. Break-even (NPV = 0, IRR = 6%) is achieved when capacity market revenues increase by 15% above the base rate and annual system service revenues exceed €3.57 million. The results indicate that the long-term viability of hybrid renewable systems in Central Europe is highly sensitive to market dynamics and regulatory support. Increasing the Battery Inverter Ratio (BIR) and Inverter Loading Ratio (ILR) enhances grid stability and energy output, but remains economically favourable only if declining technology costs offset the decreasing marginal market value of PV generation.
Source: Energies
DOI: 10.3390/en19174005
Authors: Marek Bogacki, Katarzyna Myślińska
Institutions: AGH University of Krakow, Polska Grupa Energetyczna (Poland)
Language: English
Subfield: Energy Engineering and Power Technology
Field: Energy
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $3,137
Funder: Ministerstwo Edukacji i Nauki
Award: G3782483750
OpenAlex ID: W7204233838
