Scheduling algorithms for time-dependent V-shaped processing times with agreeable slopes around a common ideal time
Year: 2026
Type: article
Abstract: We study a single-machine problem with time-dependent processing times following a V-shape around a common ideal time. The slopes are under an agreeableness condition and can be asymmetric and job-specific. Its application lies in production with a moving assembly line, to minimize a worker’s walking time retrieving parts from a supply point, in which part weight affects walking velocity. In this problem, the global start time (or ideal time) can be fixed or variable. For both variants, we devise the first function-based monotonic dynamic programs, which let us derive fully polynomial time approximation schemes employing a recent framework for K -approximation sets and functions. For the variable variant with asymmetric, job-uniform slopes, we introduce a polynomial time algorithm.
Source: Annals of Operations Research
Authors: Nir Halman, Helmut A. Sedding
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: hybrid
Estimated APC paid: $3,090
OpenAlex ID: W7214538271
