Work

Critical Assessment of Management Practices and Policies for Stormwater and Sediment Ponds in South Carolina

Year: 2010
Type: conference-paper
Abstract: Local regulations in South Carolina must comply with SCDHEC standards, which require stormwater detention and sediment retention ponds be designed based on runoff from 2-and 10-year 24-hour rainfall events.Inadequate pond performance, particularly during more frequent, shorter duration and high intensity events, raises questions about the adequacy of the design standards.As one approach to answer these questions, a parametric study was conducted to evaluate pond performance during storms other than the regulatory 2-and 10-year 24-hour events, specifically for variable frequency, depth, and duration storms, and longterm.Results demonstrate stormwater and sediment ponds designed in accordance with current policies are not sufficient to control downstream flooding and channel aggradation-degradation.For better control, 24hour extended detention of the 1-year 24-hour storm should be implemented.The study results also suggest stormwater detention and sediment retention ponds should be designed to control flow and sediment for storms with a return period equal to or less than 1-year.
Language: English
Open Access status: green
OpenAlex ID: W7215127
FWCI:
Cites: 3
Cited by:
Related to: 10