TwinEU - German Pilot - Use Case 7 – TSO/DSO/Aggregator data exchange to enable small-flexibility usage
Year: 2026
Type: dataset
Abstract: The data was used as part of the German Pilot - Use Case 7 to test the TwinEU Data Space Connector in a Congestion management scenario between a TSO, DSO and an aggregator, and is described in Deliverable 6.4 - "End-to-end flexibility and dynamic grid monitoring". The deliverable can be found on the project website: https://twineu.net/deliverables/ - The file “UC 7- Simulation - Complete Process Overview” contains the descriptions of the other files. Further explanation of the data can be found in the Section “3.3.3.3.1 Description of the used data" of the mentioned deliverable.
Language: English
Topic: Smart Grid Energy Management
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
Funder: European Commission
Award: Digital Twin for Europe
OpenAlex ID: W7220741544
Cites:
Cited by:
Related to:
