Identification and Evaluation of Risk in Sustainable Construction Projects: Application of a Hybrid BWM–COCOSO Approach
Year: 2026
Type: article
Abstract: Uncertainty and risk are inherent characteristics of construction projects, particularly in large and complex upstream oil and gas developments. Effective identification and prioritization of risks are therefore essential for improving project decision making and achieving sustainable outcomes. This study aims to identify and evaluate the key risks affecting sustainable construction projects in the upstream oil and gas industry of Iran using a hybrid Best–Worst Method (BWM) and Combined Compromise Solution (COCOSO) approach. Initially, 40 potential risks were identified from literature and expert opinions and validated through the Fuzzy Delphi method (FDM). Subsequently, BWM was applied to determine the weights of the risk evaluation criteria, where “impact on quality” emerged as the most influential criterion. The COCOSO method was then employed to prioritize the identified risks. The results indicate that insufficient technical information, inefficient project management, and exchange rate fluctuations are the most critical risks. Sensitivity analysis using the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS), Multi-Attributive Border Approximation Area Comparison (MABAC), and Evaluation based on Distance from Average Solution (EDAS) was conducted to examine the stability of the obtained risk rankings. The results showed a high degree of consistency across the alternative ranking methods and the examined sensitivity scenarios. These findings provide practical insights for improving risk management and supporting the prioritization of critical risks in sustainable construction projects within the upstream oil and gas sector.
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: gold
Estimated APC paid: $1,470
OpenAlex ID: W7221453319