Work

Feasibility Evaluation of The Probowangi Toll Road For Enhancing Accessibility and Connectivity in Banyuwangi Regency

Year: 2026
Type: article
Abstract: The construction of the Probolinggo–Banyuwangi (Probowangi) Toll Road, as a national strategic project, is expected to enhance regional connectivity and accessibility in East Java. With a total length of 123,5 km, this infrastructure is projected to reduce congestion, lower logistics costs, and improve the efficiency of goods distribution and mobility. This research evaluates the project's economic and financial feasibility, as well as its impact on improved accessibility in Banyuwangi Regency. The research employs a literature review, secondary data analysis, economic feasibility analysis (BCR, NPV, IRR), financial analysis, and socio-economic impact assessment. The results indicate that the project is feasible, with significant benefits in improving transport efficiency, generating economic opportunities, and supporting regional development along the corridor. The Probowangi Toll Road is therefore considered a strategic infrastructure to promote balanced regional development and strengthen connectivity between Java and Bali.
Language: English
Open Access status: gold
Estimated APC paid: $22
OpenAlex ID: W7224933174
FWCI:
Cites:
Cited by:
Related to: 10