Work

Analisis Deviasi Estimasi Biaya Pekerjaan Struktur antara Metode SNI 7394:2008, AHSP Permen PUPR Nomor 8 Tahun 2023, dan Analisa Kontraktor pada Proyek Gedung Parkir di BSD Tangerang

Year: 2026
Type: article
Abstract: Differences in unit price analysis methods may produce different construction cost estimates despite identical work quantities. This study compares construction cost estimates using SNI 7394:2008, AHSP based on Permen PUPR No. 8 of 2023, and the Contractor’s Cost Analysis for the structural work of a parking building in BSD Tangerang. A descriptive-comparative case study was conducted using identical work quantities. The Contractor’s Cost Analysis estimated IDR 319,348,554,739, while AHSP and SNI estimated IDR 521,382,643,167 and IDR 523,334,042,738, with deviations of 63.26% and 63.88%, respectively. These findings provide a reference for improving construction cost estimation in similar projects.
Language: English
Open Access status: bronze
OpenAlex ID: W7225169529
FWCI:
Cites:
Cited by:
Related to: 10