Work

Optimizing Workplace Layout to Reduce Material Handling Time: A Review

Year: 2026
Type: article
Abstract: Material handling can consume a substantial share of shop-floor labour even when processing methods remain unchanged. This study develops a reproducible comparison of existing and improved workplace layouts for a xyz small manufacturing unit. A deterministic route-and-time model represents seven work areas, six sequential transfers, and a reference output of 240 units in twelve batches. Handling time is decomposed into loaded travel, empty return, loading and unloading, and route waiting. All numerical inputs are synthetic assumptions, not observed industrial measurements. Reducing the cumulative loaded route from 114 to 50 m per batch lowers travel time from 237.50 to 104.17 s per batch. With unchanged transfer work and a separately assumed reduction in waiting, total handling labour falls from 597.50 to 392.17 s per batch, equivalent to 34.37%. Geometry alone accounts for 26.67 of the 41.07 labour minutes saved per reference shift. A sensitivity analysis identifies the conditions under which congestion or slower movement would erode this benefit. The study contributes an auditable accounting framework that separates physical layout effects from operating-policy assumptions. The findings establish conditional engineering potential rather than an empirically verified treatment effect.
Language: English
Open Access status: hybrid
OpenAlex ID: W7225341362
FWCI:
Cites: 7
Cited by:
Related to: 10