Work

The PIM Error Budget and the Scar Readout

Year: 2026
Type: article
Abstract: Design paper of the Complete Build (Time Machine Blueprints, master list item 107): the navigation organ's founding numbers — the position-in-space-and-time error budget derived from the machine's own clearances — and the three-channel scar readout instrument designed to meet it, verified in the campaign Monte Carlo (SIMULATED, NOT MEASURED).
Language: English
Open Access status: green
OpenAlex ID: W7225452767
FWCI: 6.095
Cites:
Cited by: 3
Related to: 10