Work

Optimization of initiation sequence and delay times for metro‑tunnel blasting balancing gas pipeline safety and blasting performance

Year: 2026
Type: article
Abstract: To address the challenge of controlling blast-induced vibration near gas pipelines in urban underground excavations, this study takes the B-entrance of Shanshi East Road Station on Jinan Metro Line 4 as the engineering background. Through field monitoring, numerical simulation and engineering application, the joint optimization of the dynamic response of gas pipelines and rock fragmentation is investigated under three initiation Sequences—simultaneous dual-hole blasting, lateral sequential blasting and longitudinal sequential blasting and under inter-hole delay times of 5, 10, 15 and 20 ms with longitudinal sequential blasting. The results show that longitudinal sequential blasting is the optimal scheme: it reduces the peak surface vibration velocity by about 38.5% compared with simultaneous dual-hole blasting while achieving better rock fragmentation. The inter-hole delay of 5 ms is optimal, yielding the minimum von Mises stress and resultant velocity of 1.25 MPa and 1.62 cm/s, respectively, with the most ideal rock fragmentation. This scheme reduces the pipeline dynamic response while improving blasting performance, providing a reference for similar sensitive environments.
Language: English
Open Access status: gold
Estimated APC paid: $2,690
OpenAlex ID: W7225882080
FWCI:
Cites: 34
Cited by:
Related to: 10