Work

Workload Scheduling and Battery Dispatch in Geographically Distributed Data Centers: A Feasibility and Techno-Economic Assessment

Year: 2026
Type: article
Abstract: Workload flexibility and battery storage can support data-center energy management, but evaluating their operating value requires explicit checks of execution feasibility, numerical solution quality, and economic accounting. This study assesses these dimensions in a six-region benchmark with 50,000 tasks and 2407 hourly intervals. Event-time checks reveal resource violations hidden by hourly accounting; regional reassignment restores modeled feasibility but can worsen service and cost outcomes. Same-objective dispatch comparisons and numerical sensitivity analyses improve export revenue and grid-exchange smoothness relative to the historical low-carbon result, without further reducing already-zero purchased-grid emissions. Matched controls and conditional cycle-wear tests show that balanced-policy cash savings can reverse, whereas tested cost-priority adaptations retain positive improvements. Six restricted joint mixed-integer linear programs yield no additional incumbent gain. A seven-point ε-constraint analysis of cost–grid-variation tradeoffs, followed by post hoc checks, identifies one numerically non-dominated candidate and tolerance-dominating alternatives for the other six under the stated tolerances. Auxiliary forecasting remains separate and does not establish a statistically significant advantage of the tested nonlinear predictor. The findings concern deterministic, full-information operating comparisons and do not establish full-scale joint optimality, physical charging provenance, or lifecycle investment profitability.
Source: Energies
Language: English
Open Access status: gold
Estimated APC paid: $3,137
OpenAlex ID: W7226013731
FWCI:
Cites: 20
Cited by:
Related to: 10