Topology-Aware Feasibility Assessment and Coordinated Setting of Transformer Primary and Backup Protection in Islanded Renewable Power Systems
Year: 2026
Type: article
Abstract: Islanded microgrid topology and converter current limiting can alter transformer protection currents. We formulate primary and backup coordination as a topology-indexed feasible domain. A bridge test identifies source contributions that cross the protected transformer, and a joint model tests differential sensitivity and stability, overcurrent pickup and timing, load security, and device limits. At the selected inputs, four supported bridge states in an eight-entry reference library retain non-empty domains. The weak-GFL case has a narrow backup–pickup interval (0.984–1.042 pu), and its feasibility classification changes across the tested lower-current factors; the high-load case remains empty (1.860 pu load-security lower bound versus 1.326 pu sensitivity upper bound). A seven-bus reference EMT study includes 112 baseline cases, a 1232-case direction/location/resistance scan, and a 288-case coupled-controller scan. The CT stress screen reduces the all-source reference-domain volume from 0.08391 to 0.07059. All numerical results use the declared reference-network and device inputs.
Source: Energies
DOI: 10.3390/en19225473
Authors: Qi Zhu, Yu Sun, Lie Li, Yifan Zhao
Institution: State Grid Corporation of China (China)
Language: English
Subfield: Control and Systems Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $3,137
Award: G9001367786
OpenAlex ID: W7226021756