Work

A Heat-Pipe Melt Probe for Enceladus: Two-Phase Heat Transport, Capillary Limit and Descent Budget

Year: 2026
Type: article
Abstract: The system named in the title is developed here as a worked design, derived from the physics of its operating environment and reported throughout as SIMULATED, NOT MEASURED. The probe is a civilian science instrument for reaching the ocean of Enceladus and measuring its properties in place; it carries sensors and a sampler and serves peaceful exploration only. The deposited computation script produces every number in the paper from stated inputs; among its results are capillary margin factor of 2.13 as a factor, temperature drop along pipe of 6.5 kelvin and descent duration of 994 days. The study assembles component budgets for mass and power, examines how the design behaves away from its design point, and closes with an explicit statement of what the sizing does not establish.
Language: English
Open Access status: green
OpenAlex ID: W7226025609
FWCI:
Cites:
Cited by:
Related to: 10