Work

Analysis of Flood Control Measures for the Dombo River in Sayung Based on a 50 year Return Period Flood Discharge

Year: 2026
Type: article
Abstract: The Dombo Sayung River in Demak Regency is one of the rivers prone to flooding due to increased flow discharge during the rainy season and the limited capacity of the river cross-section to accommodate water flow. This study aims to analyze the capacity of the Dombo Sayung River cross-sections under the 50-year return period flood discharge (Q50) of 78.96 m³/s using HEC-RAS 6.6 software. Hydrological analysis was conducted using the Nakayasu Synthetic Unit Hydrograph (SUH) method to determine the design flood discharge, while hydraulic analysis was carried out using a steady flow approach at several river cross-sections, namely STA 0, STA 29, and STA 60 (Dam 60). The simulation results indicate that at STA 0, the water surface elevation increased significantly but remained within the river cross-section capacity, indicating relatively safe conditions. At STA 29, the water level approached the riverbank elevation, indicating a critical condition with a high potential for overflow due to additional discharge caused by extreme rainfall or river sedimentation. Meanwhile, at STA 60 (Dam 60), the river cross-section was still relatively capable of accommodating the 50-year return period flood discharge, although an increase in water level was observed during the simulation. Based on these findings, flood control measures such as river normalization, sediment dredging, embankment elevation improvement, and routine river maintenance are required to enhance flow capacity and reduce flood risk in the Dombo Sayung River area.
Language: English
Open Access status: diamond
OpenAlex ID: W7229894840
FWCI:
Cites: 1
Cited by:
Related to: 10