Work

IceTop Shower Size and Energy: The S125 Budget at the South Pole

Year: 2026
Type: article
Abstract: This paper computes a shower-development budget for the IceTop surface array of the IceCube Neutrino Observatory at the South Pole, using published observations as inputs and standard relations stated in full. The principal computed quantities are: S125 VEM 1, energy proton eV 2e+15, energy iron eV 3.4e+15; S125 VEM 10, energy proton eV 2.244e+16, energy iron eV 3.56e+16; S125 VEM 100, energy proton eV 2.518e+17, energy iron eV 3.728e+17; snow correction factor = 1.331; energy proton at S125 10 eV = 2.244e+16; iron proton energy ratio at 10 = 1.587. Each value is derived in the deposited code from the stated inputs, so the budget can be re-run with alternative published values. The results place this measurement quantitatively alongside other observatories and energy ranges treated with the same relations, and the discussion identifies which input dominates the uncertainty of each headline number. Computed from stated assumptions and published data, not a new measurement.
Language: English
Open Access status: green
OpenAlex ID: W7230136679
FWCI:
Cites:
Cited by:
Related to: 10