A Cable-Net Roof for a Wide Underground Cavern on Mars: Tension Structure, Span and Excavation Budgets

Year: 2026
Type: article
Abstract: This study sizes the system named in its title from stated physical relations and a stated operating basis, and reports the result as SIMULATED, NOT MEASURED. The operating principle is a tensioned cable net anchored into cavern walls, carrying a regolith shielding layer over a wide clear span that no masonry arch of reasonable thickness could cover. The system is a civilian underground hall for fourteen people housing a settlement's workshop, gymnasium and assembly space on Mars. Every figure is computed by the deposited script from its inputs rather than asserted. At the design point the overburden pressure is 53.4 kilopascals, the dose at depth is 0.001 millisieverts per day against 0.55 millisieverts per day at the surface, the excavated quantity is 3840.0 cubic metres (9216.0 tonnes), and the average power demand is 45.9 kilowatts with a steady heat loss of 13.29 kilowatts. Mass, power, thermal and construction budgets are assembled from components so they can be audited line by line, off-design behaviour is discussed openly, and the limits of the sizing are stated in full. The design is presented as a civilian system throughout, for use on the Mars, with its governing constraint identified and quantified rather than merely encountered.
Language: English
Open Access status: green
OpenAlex ID: W7230652217
FWCI:
Cites:
Cited by:
Related to: 10