Analysis of Causes and Risk Mitigation for Delivery Delays Based on On-Time In-Full (OTIF) Data in Non-Cement Distribution Using RCA and FMEA Methods at PT XYZ
Year: 2026
Type: article
Abstract: Delivery punctuality is an important indicator of logistics service performance, yet non-cement distribution at PT XYZ still experiences delays. On Time In Full (OTIF) data from May to July 2026 recorded that only 54.64% of 14,986 shipments were delivered on time. This study aims to determine the on-time delivery rate, identify the dominant causes and root causes of delay, and determine mitigation priorities. The methods used were Pareto diagram, Root Cause Analysis (RCA) with fishbone and 5 Why, and Failure Mode and Effect Analysis (FMEA), with Severity, Occurrence, and Detection rated by two respondents. The Pareto results show that long parking time (49.9%) and unloading schedule (41.1%) caused 91.0% of the delays. RCA identified the root causes as the absence of a standard maximum stopping time, a joint arrival scheduling mechanism with receivers, a procedure for communicating estimated arrival, and a cargo readiness confirmation procedure. Based on FMEA, the highest Risk Priority Number (RPN) belongs to the absence of a joint arrival scheduling mechanism with receivers (336), followed by the absence of an estimated arrival notification procedure (168) and a standard maximum stopping time (120). Joint arrival scheduling with receivers should be the priority for improvement.
Institution: Universitas Muhammadiyah Gresik
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: diamond
OpenAlex ID: W7230846379