Work

The Mekong Delta Budget: Dam-Era Load Reduction Against Subsidence and Sand Demand

Year: 2026
Type: article
Abstract: This paper computes a fluvial sediment budget for the Mekong River and its Vietnamese delta, using published gauging records as inputs and standard relations stated in full. The principal computed quantities are: accretion baseline mm per yr = 2.857; accretion scenario mm per yr = 1.339; required load Mt per yr = 336; load reduction pct = 53.12; baseline supply over required ratio = 0.4762. Each value is derived in the deposited code from the stated inputs, so the budget can be re-run with alternative published values. The results place this system quantitatively alongside other gauged rivers and deltas treated with the same relations, and the discussion identifies which input dominates the uncertainty of each headline number. Computed from stated assumptions and published data, not a new measurement.
Language: English
Open Access status: green
OpenAlex ID: W7230894831
FWCI:
Cites:
Cited by:
Related to: 10