Work

The Yangtze River After the Three Gorges Dam: A Suspended-Load Step Change at Datong

Year: 2026
Type: article
Abstract: This paper computes a fluvial sediment budget for the Yangtze River at Datong gauging station, China, using published gauging records as inputs and standard relations stated in full. The principal computed quantities are: annual water volume km3 = 896.2; concentration pre mg per L = 524.4; concentration post mg per L = 145.1; load decline pct = 72.34; trapped or retained Mt per yr = 340; years of post load in one pre year = 3.615. Each value is derived in the deposited code from the stated inputs, so the budget can be re-run with alternative published values. The results place this system quantitatively alongside other gauged rivers and deltas treated with the same relations, and the discussion identifies which input dominates the uncertainty of each headline number. Computed from stated assumptions and published data, not a new measurement.
Language: English
Open Access status: green
OpenAlex ID: W7231524964
FWCI:
Cites:
Cited by:
Related to: 10