Year: 2026
Type: article
Abstract: This paper analyzes the construction of the precast prestressed concrete beams of the viaduct at the intersection of highways BR-364 and BR-435, in Vilhena, Rondônia, Brazil. The objective was to describe the construction process of the beams and to compare the procedures observed on site with the recommendations of the technical literature, Brazilian standards and the design project. The research is a qualitative, descriptive case study, supported by bibliographic and documentary research. Data were collected by monitoring the work between July 2024 and January 2025, through photographic records, review of the design project and analysis of the concrete quality control reports. The viaduct has a 38 m span, covered by five 39 m long I-beams, post-tensioned with four tendons of 15 strands each and cast on the construction site with 40 MPa concrete. Construction was described in nine stages: site preparation, reinforcement assembly, duct installation, formwork assembly, concreting, form removal, strand installation and prestressing, grouting, and transport and lifting. The concrete met the specified strength, with estimated characteristic strengths of 44.3 MPa and 45.2 MPa in the tested beams, and prestressing was carried out by a specialized company, with the concrete at an age well above the required minimum. Casting the beams on site allowed the same team to carry out all stages and simplified transport and lifting, performed with one trailer and two cranes. It is concluded that the construction was generally in accordance with technical recommendations, and that the main point of attention is the workforce, which requires constant supervision and control on site.
Source: Revista fisio&terapia.
DOI: 10.69849/e83d2424
Language: English
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: hybrid
OpenAlex ID: W7233175975
