Railway-Trigger Earthquake Warning with Automatic Braking: Detection Latency, Train Speed and Braking-Distance Budgets
Year: 2026
Type: article
Abstract: Seismometers buried beside the track at regular intervals feed a signalling system that cuts traction power and applies emergency braking the moment a threshold earthquake is declared, because a train at three hundred kilometres per hour needs kilometres of track to stop and every second of warning is braking distance saved. Its operating principle: trackside seismometers wired into railway signalling, cutting power and braking trains automatically on a declared earthquake. Headline values are rail p travel rail to nearest station rail s = 2.244; rail detection latency rail s = 4.433; rail total alert rail latency s = 5.333; rail blind zone rail radius km = 14.3; rail warning time rail at 50 km rail s = 9.358; rail warning time rail at 100 km rail s = 23.44. The railway entries translate seconds into metres of braking distance throughout, because track, not time, is the currency a driver spends. SIMULATED, NOT MEASURED. Computed solely for the safety of passengers and railway infrastructure, this system has no targeting purpose; nothing in it is a weapon aimed at any person, state or object on Earth.
Author: Aldred, William Alexander
Language: English
Subfield: Artificial Intelligence
Field: Computer Science
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W7233549922
FWCI:
Cites:
Cited by:
Related to:
