Work

From Diagnosis to Governance: An Integrative Project Control Framework Based on Buffer Entitlements, Continuous Forecast Revision, and Change Cost Internalization

Year: 2026
Type: article
Abstract: This paper proposes a practical project governance framework designed to address chronic schedule overruns, excessive workload concentration, and project failures in knowledge-intensive environments such as software development. While classical Critical Path Method (CPM), Critical Chain Project Management (CCPM), and modern agile management approaches have contributed valuable insights, few practical frameworks integrate schedule uncertainty, incentive design, change management, and human capacity constraints into a unified governance model. The proposed framework introduces four key mechanisms: dynamic forecast revision, buffer entitlement, change-cost internalization, and capacity governance. Rather than assuming perfect optimization or continuously updated dynamic control models, the framework provides an operational surrogate model suitable for environments characterized by uncertainty, incomplete information, and evolving requirements. The study argues that project governance should focus not only on efficiency but also on sustainability, reducing the likelihood of death marches, excessive overtime, and systemic productivity decline caused by fatigue accumulation. The framework is presented as a practical approximation intended for real-world management rather than a mathematically optimal solution. Its value lies in offering implementable governance rules that connect project planning theory with contemporary work-style reform objectives and knowledge-work realities.
Author: By STUDENT
Language: English
Open Access status: green
OpenAlex ID: W7233564153
FWCI:
Cites:
Cited by:
Related to: