Work

The Munich Hailstorm of 1984 and the Growth Budget of Nine-Centimetre Stones: Time, Water and Updraft Strength

Year: 2026
Type: article
Abstract: Working from the same collection law pushed to the giant-hail end of the scale, where the fall speed exceeds fifty metres per second, the collected water per stone approaches half a kilogram, and the growth time tests whether a single updraft pass can suffice, the paper prices one situation: an embryo of 10 millimetres growing to 95 millimetres under an updraft of 58 metres per second with 4.2 grams per cubic metre of supercooled water, collection efficiency 0.95, air density 0.72 kilograms per cubic metre, ice density 910 kilograms per cubic metre and drag coefficient 0.52, representing the storm that struck Munich on 12 July 1984. Its stated products are the growth time to 95 millimetres, the mass and impact energy of the finished stone, the collected-water mass, and whether the final fall speed leaves any support margin in the stated updraft. Growth for the Munich storm to the target size takes 17.8 minutes and collects 0.408 kilograms of water, ending at 54.9 metres per second against an updraft of 58.0 metres per second. Munich 1984 remains a benchmark European hail disaster; pricing its largest stones shows how narrow the corridor of updraft strength and water content is that can manufacture them.
Language: English
Open Access status: green
OpenAlex ID: W7233575704
FWCI:
Cites:
Cited by:
Related to: