Tidal Barrage Sluice-Turbine Pair Power: Estuary Potential Energy, Sluice Discharge and Two-Way Generation Budgets

Year: 2026
Type: article
Abstract: The barrage pair is presented here: a computed barrage pair design, rated at 72,307 kilowatts, on the barrage pair's single stated barrage pair operating principle: a barrage across an estuary pairs its turbines with large sluices that work as a team across the tide: sluices fill and empty the basin quickly when no head is available for generation, so the turbines spend more of each cycle at a useful head — the pair, not the turbine alone, is the operating principle. The barrage pair system is an estuary basin of 22 square kilometres with a tidal range of 8.2 metres, twenty-four turbines of 9 megawatts, and sluices of stated total area and discharge coefficient working under a stated filling head. The barrage pair's target is the barrage pair net average power from the basin potential-energy formula at a stated system efficiency, installed capacity, and the sluice discharge and filling time that show the sluices earning their place beside the turbines. For the barrage pair, the net output is 72,307 kilowatts, and the barrage pair's annual yield is 212 gigawatt-hours, at the barrage pair's capacity factor of 0.335. Per tide, the stored potential energy is 2.07 gigawatt-hours; the installed capacity stands at 216 megawatts; raw average power, before the system efficiency is applied, is 172 megawatts; and the sluices pass 5774 cubic metres per second at the stated filling head. No targeting or weapon application belongs to this design; it is a civilian-energy study, computed, whose results come from simulation on stated assumptions, unmeasured.
Language: English
Open Access status: green
OpenAlex ID: W7233577988
FWCI:
Cites:
Cited by:
Related to: