Work

Analysis of Loss Prevention in Underground Mine’s Ore Delivery Operations Through the Implementation of an Integrated Remote Monitoring System on Fire Protection Equipment

Year: 2026
Type: article
Abstract: Unintended discharges of fire suppression systems (FSS) on underground conveyor systems at PT Freeport Indonesia (PTFI) disrupted single-line ore delivery operations and resulted in substantial opportunity losses. Before this study, most FSS units were not integrated into a centralized remote monitoring platform, causing delays in incident detection, response, and operational recovery. This study examined the contribution of limited remote monitoring capabilities to prolonged downtime and quantified the reductions in operational downtime and opportunity losses associated with integrating FSS status monitoring into the existing AVEVA PI Vision dashboard. A quantitative, quasi-experimental pretest–posttest design was employed to analyze 48 verified discharge events, comprising 29 events in Phase 1 (2022–2023) and 19 events in Phase 2 (2024–2025). Data were obtained from the AVEVA PI System historian and evaluated using the prevention–appraisal–failure (PAF) cost framework. Statistical analyses included paired-samples t-tests and Wilcoxon signed-rank tests involving seven matched conveyor systems. None of the recorded discharges resulted from an actual fire. Mean downtime per event decreased by 37.4%, from 2.967 to 1.857 hours, while the matched-conveyor analysis indicated a 43.6% reduction (t = 5.2203, p = 0.00099; Wilcoxon p = 0.0078; Cohen's dz = 1.97). Annualized failure costs decreased by 53.4%, from approximately USD 22.05 million to USD 10.28 million, with a conservative estimate of USD 4.9 million in annual avoided losses attributable solely to reduced downtime duration. The findings indicated that integrating FSS status monitoring into AVEVA PI Vision was associated with substantial reductions in operational downtime, particularly prolonged outage events, and demonstrated the potential for a financial payback period of several weeks.
Language: English
Open Access status: diamond
OpenAlex ID: W7233604227
FWCI:
Cites:
Cited by:
Related to: