Work

Design Blueprint: Dam and Reservoir Rapid-Shutdown Warning: Detection Latency, Gate Travel and Drawdown Budgets

Year: 2026
Type: article
Abstract: Design blueprint derived from the source paper (DOI 10.5281/zenodo.24265176): Strong-motion sensors on a dam's abutments and gallery, backed by a small upstream seismic array, command spillway gates to safe positions, close outlet valves and alert the downstream valley the moment damaging shaking is declared, because a dam's dangerous decisions must be taken in minutes, not after an inspection convoy arrives. Its operating principle: abutment and upstream sensors commanding gates, valves and downstream alerts automatically when damaging shaking is declared. Headline values are dam p travel dam to nearest station dam s = 1.856; dam detection latency dam s = 4.505; dam total alert dam latency s = 7.005; dam blind zone dam radius km = 22.38; dam warning time dam at 50 km dam s = 7.564; dam warning time dam at 100 km dam s = 21.71. Mechanical travel times dwarf electronic latencies here, and the entries are ordered to make that hierarchy impossible to miss. SIMULATED, NOT MEASURED. In the protection of downstream residents and public infrastructure, this computed study treats the dam system as protective only, with nothing in it usable for targeting or as a weapon against any individual, government or terrestrial object. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. The design is a civilian life-safety and infrastructure-protection system for earthquake early warning, and has no targeting or weapon application. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.
Language: English
Open Access status: green
OpenAlex ID: W7233612679
FWCI:
Cites:
Cited by:
Related to: