Work

Entrainment Along the Taconnaz Track: Mass Growth, Momentum Dilution and Energy Budgets

Year: 2026
Type: article
Abstract: For an avalanche released above the Taconnaz glacier path near Les Houches, France, with release volume 25,000 cubic metres at density 250 kilograms per cubic metre, descending an 1,800-metre track of mean width 45 metres whose snow cover can be eroded to a mean depth of 0.22 metres at density 200 kilograms per cubic metre, the flow moving at 32 metres per second before entrainment: An entrainment and mass-growth budget is computed. The Taconnaz flow principal quantities are: release volume m3 = 2.500e+04 cubic metres; release mass kg = 6.250e+06 kilograms; track length m = 1,800.0 metres; mean width m = 45 metres; erosion depth m = 0.22 metres; entrained volume m3 = 1.782e+04 cubic metres. Momentum dilution and the kinetic-energy price of entrainment are computed from the same mass figures, so the growth of the flow and its cost cannot be quoted separately. Remaining quantities for the Taconnaz flow follow: entrained mass kg = 3.564e+06 kilograms; final mass kg = 9.814e+06 kilograms; mass growth ratio = 1.57 dimensionless; flow speed before m s = 32 metres per second; speed after mixing m s = 20.379 metres per second; kinetic energy before J = 3.200e+09 joules; entrainment energy cost J = 1.825e+09 joules; frontal erosion rate m2 s = 7.04 square metres per second; volumetric entrainment rate m3 s = 316.8 cubic metres per second.
Language: English
Open Access status: green
OpenAlex ID: W7233615097
FWCI:
Cites:
Cited by:
Related to: