Francis Reaction Turbine for a Mid-Head River Dam: Runner, Draft Tube and Cavitation Budgets for an 8.5 Megawatt Plant

Year: 2026
Type: article
Abstract: A vertical Francis turbine at a mid-head river dam is designed here from first budgets upward. Its operating principle: water enters a spiral case under pressure, passes adjustable guide vanes that set both flow and swirl, and gives up energy across a fully submerged runner, with a draft tube recovering much of the leaving kinetic energy. At a net head of 80.8 metres and 12.0 cubic metres per second, the runner of 1.82 metres diameter delivers 8,490 kilowatts net; the plant cavitation number is 0.094 against a critical value of 0.056, a margin of 1.7. The cavitation budget is the centre of this design: the runner setting below tailwater is chosen from the computed plant cavitation number, not from habit, and the draft tube recovery fraction is carried as an explicit term so its contribution to output can be audited. Part-load swirl instability is treated as an operating restriction with a stated excluded band rather than as a surprise. Every dimension and rating traces back to budgets for head, discharge, runner efficiency and cavitation, plus an energy-storage budget where the plant stores water for later use, all evaluated by the deposited program from its declared inputs. This is a civilian power design, computed and simulated rather than measured, with no weapon or targeting application anywhere in it.
Language: English
Open Access status: green
OpenAlex ID: W7233615833
FWCI:
Cites:
Cited by:
Related to: